IJSHMS

Improving Operational Efficiency and Reducing Material Waste in a Precast Concrete SME: Insights from a Peruvian Case Study

© 2025 by IJSHMS

Volume 3 Issue 2

Year of Publication : 2025

Author : Nataly Jesus Barzola-Ninanya, Alessandra Solange Cuadros-Pita , Wilson David Calderón-Gonzales

: 10.56472/25849756/IJSHMS-V3I2P102

Citation :

Nataly Jesus Barzola-Ninanya, Alessandra Solange Cuadros-Pita , Wilson David Calderón-Gonzales, 2025. "Improving Operational Efficiency and Reducing Material Waste in a Precast Concrete SME: Insights from a Peruvian Case Study" ESP International Journal of Science, Humanities & Management Studies(ESP-IJSHMS)  Volume 3, Issue 2: 15-26.

Abstract :

Precast concrete SMEs often suffered from operational inefficiencies, particularly due to non-standardized procedures, excessive material waste, and poorly designed layouts. Previous studies highlighted Lean Manufacturing as an effective methodology, yet its adaptation to resource-constrained SMEs remained underexplored. This research addressed those challenges by developing and implementing an integrated production model based on Lean Manufacturing, Kaizen, and Systematic Layout Planning. The model proposed key actions including work standardization, ergonomic redesign, supplier management, and layout optimization. Validation in a Peruvian SME revealed a 31.58% increase in value-added operations, an 80% reduction in rejected materials, and a 32.31% decrease in travel time. These results confirmed the model’s effectiveness in reducing waste and improving productivity. Academically, the study contributed a replicable framework for lean implementation in SMEs. Socioeconomically, it strengthened the competitiveness and sustainability of small manufacturers in emerging economies. Future research should explore its scalability and digital integration to further enhance real-time process control and impact.

References :

[1] Baptista et al. "Transformando la construcción en América Latina y el Caribe: digitalización e innovación como claves para la sostenibilidad" (2024) doi:10.18235/0013226.

[2] Pérez et al. "Una revisión del impacto de la adopción de la metodología Lean Construction en los proyectos de construcción" Cuaderno activa (2023) doi:10.53995/20278101.1050.

[3] Meire et al. "Método para la dirección de obra de viviendas modulares pasivas" Informes de la construcción (2023) doi:10.3989/ic.6452.

[4] Cruz-Rivero et al. "Omax y Lean Manufacturing como Herramientas de Medición y Mejoramiento de la Productividad en una MIPYME del Sector Manufacturero" Ciencia latina revista científica multidisciplinar (2024) doi:10.37811/cl_rcm.v7i6.9142.

[5] Hoz and Sandoval "Sistema productivo industrial utilizando modelos de manufactura esbelta" Revista venezolana de gerencia (2023) doi:10.52080/rvgluz.28.e9.44.

[6] Tamez et al. "Reducción de Desperdicios y Mejoramiento de la Productividad en una Empresa del Ramo Automotriz" Ciencia latina revista científica multidisciplinar (2023) doi:10.37811/cl_rcm.v7i5.7765.

[7] Martínez "Impacto de la COVID-19 en la producción, empleo y digitalización de empresas en Guanajuato: una primera aproximación" Nova scientia (2021) doi:10.21640/ns.v13ie.2795.

[8] Camposano-Castillo et al. "Proposal for the implementation of the DMAIC methodology as a tool to improve productivity in the manufacturing area of an organic chocolate company – 2022" Salud ciencia y tecnología - serie de conferencias (2024) doi:10.56294/sctconf2024646.

[9] Rivera et al. "Propuesta de construcción de competencias de innovación en la formación de ingenieros en el contexto de la industria 4.0 y los objetivos de desarrollo sostenible (ODS)" Formación universitaria (2021) doi:10.4067/s0718-50062021000200075.

[10] Amaya et al. "Gestión de la calidad: Un estudio desde sus principios" Revista venezolana de gerencia (2020) doi:10.37960/rvg.v25i90.32406.

[11] Herrera et al. "Herramientas de manufactura esbelta que inciden en la productividad de una organización" Revista lasallista de investigación (2019) doi:10.22507/rli.v16n1a6.

[12] P. de Concreto, “Sector construcción del Perú,” 2018. [Online]. Available: https://prefac.com.pe/aprende-a-crear-espacios-utilizando-el-concreto-2/.

[13] Gestión, “Consumo nacional de cemento,” gestión, 2020. [Online]. Available: https://gestion.pe/economia/consumo-nacional-de-cemento-continua-en-negativo-y-cae-69-en-mayo-noticia/?ref=gesr.

[14] INEI, “Actividad del sector construcción de Perú,” p. 2019, 2019.

[15] D. Kusuma and A. Cahyana, "Slp method boosts production efficiency by 16% in indonesia", Indonesian Journal of Innovation Studies, vol. 25, no. 2, 2024. https://doi.org/10.21070/ijins.v25i2.1123

[16] J. C. Quiroz-Flores, F. Acuña-Cervantes, A. Quicaña-Arbieto, and S. Nallusamy, "Lean Operations Management Model to Increase On-Time Project Delivery in a Construction Company," SSRG International Journal of Civil Engineering, vol. 10, no. 4, pp. 22–28, Apr. 2023, doi: 10.14445/23488352/JJCE-V1014P104.

[17] U. Amrina, R. Oktora, D. Widaningrum, & I. Mayangsari, "Analysis of production area layout design based on lean and green thinking in the micro, small and medium enterprises (msme) industry", Jurnal Sistem Dan Manajemen Industri, vol. 8, no. 2, p. 107-118, 2024. https://doi.org/10.30656/jsmi.v8i2.8981

[18] L. MENENDEZ, "Experimental explorations with digital fabrication for prefabricated construction systems", Proceedings of International Structural Engineering and Construction, vol. 11, no. 1, 2024. https://doi.org/10.14455/isec.2024.11(1).aae-12

[19] Y. Zhang and X. Shi, "Research on design method of prefabricated concrete structure based on bim technology",, p. 380-385, 2024. https://doi.org/10.1007/978-981-97-5108-2_41

[20] R. Wang and Y. Wang, "Research on optimization of rebar cutting process for prefabricated concrete components based on bpi", Journal of Physics Conference Series, vol. 1827, no. 1, p. 012106, 2021. https://doi.org/10.1088/1742-6596/1827/1/012106

[21] U. Khasanah, A. Sutarto, & N. Izzah, "Work facilities improvement using systematic layout planning to reduce the risk of manual handling", Journal of Novel Engineering Science and Technology, vol. 1, no. 01, p. 15-23, 2022. https://doi.org/10.56741/jnest.v1i01.56

[22] A. Hindratmo and C. Oktavia, "Perancangan relayout tata letak fasilitas guna mengurangi biaya material handling pada ukm tahu “srt” kediri", JOURNAL OF RESEARCH AND TECHNOLOGY, vol. 8, no. 2, 2023. https://doi.org/10.55732/jrt.v8i2.727

[23] J. Campos-Sonco, V. Saavedra-Velasco, & J. Quiroz-Flores, "Warehouse management model to increase the level of service in peruvian hardware smes",, 2022. https://doi.org/10.18687/laccei2022.1.1.153

[24] A. Nicał, "Optimization of aggregates supply for concrete plants", Archives of Civil Engineering, vol. 64, no. 3, p. 99-110, 2018. https://doi.org/10.2478/ace-2018-0032

[25] A. Azis, "Layout criteria for enhancing indonesian smes production’s performance", International Journal of Emerging Trends in Social Sciences, vol. 3, no. 2, p. 80-85, 2018. https://doi.org/10.20448/2001.32.80.85

[26] D. Herwanto, A. Suzianti, & K. Komarudin, "Workplace design in indonesian manufacturing small and medium-sized enterprises: review and further research", Production Engineering Archives, vol. 30, no. 1, p. 115-126, 2024. https://doi.org/10.30657/pea.2024.30.11

[27] H. Liu, X. Liu, L. Lin, Y. Xu, & S. Islam, "Analysis of workshop facility layout planning based on the timed petri net and systematic layout planning v1",, 2020. https://doi.org/10.17504/protocols.io.becmjau6

[28] B. Saputra, S. Arifin, & A. Merjani, "Perbaikan tata letak fasilitas dengan metode systematic layout planning (slp) untuk mengurangi jarak perpindahan material (studi kasus ukm kerupuk karomah)", Profisiensi Jurnal Program Studi Teknik Industri, vol. 8, no. 1, p. 71-82, 2020. https://doi.org/10.33373/profis.v8i1.2557

[29] A. Fadilah, A. Hikam, D. Muhtar, M. Anom, & A. Rifai, "Perancangan ulang tata letak ikm tahu sehat sari untuk mengurangi jarak material handling", Industrika Jurnal Ilmiah Teknik Industri, vol. 9, no. 1, p. 1-11, 2025. https://doi.org/10.37090/indstrk.v9i1.1831

Keywords :

Lean Manufacturing, Kaizen, Precast Concrete SME, Material Waste Reduction, Systematic Layout Planning, Work Standardization.